FEW TYPES OF COST ESTIMATES WE WORK ON:

Here is a structured list of the CSI MasterFormat Divisions:
General Requirements
•Division 00 – Procurement and Contracting Requirements
•Division 01 – General Requirements
Facility Construction
•Division 02 – Existing Conditions
•Division 03 – Concrete
•Division 04 – Masonry
•Division 05 – Metals
•Division 06 – Wood, Plastics, and Composites
•Division 07 – Thermal and Moisture Protection
•Division 08 – Openings
•Division 09 – Finishes
•Division 10 – Specialties
•Division 11 – Equipment
•Division 12 – Furnishings
•Division 13 – Special Construction
•Division 14 – Conveying Equipment
Facility Services
•Division 21 – Fire Suppression
•Division 22 – Plumbing
•Division 23 – Heating, Ventilating, and Air Conditioning (HVAC)
•Division 25 – Integrated Automation
•Division 26 – Electrical
•Division 27 – Communications
•Division 28 – Electronic Safety and Security
Site and Infrastructure
•Division 31 – Earthwork
•Division 32 – Exterior Improvements
•Division 33 – Utilities
•Division 34 – Transportation
Process Equipment
•Division 40 – Process Integration
•Division 41 – Material Processing and Handling Equipment
•Division 42 – Process Heating, Cooling, and Drying Equipment
•Division 43 – Process Gas and Liquid Handling, Purification, and Storage
•Division 44 – Pollution and Waste Control Equipment